I’m not even a yard into the DDW project, and I’m already over it. I like how it looks, but I don’t really enjoy using two shuttles. My shuttle changes are good, it’s not that.  It’s just time consuming to switch them, to make sure they enter the weft correctly so there’s no thread running up the side where it shouldn’t be.  I’ll likely continue on until the warp is used up. I’m considering trying some different colors to see how they look, but still.. two shuttles.

Three holes are ready for fruit trees. Five more to go. We still need to dig the trench for the water lines too. Thank goodness those don’t need to be as deep.  It’s raining here, or what qualifies as rain for this area. Not enough for the ground to absorb anything to speak of, though we’re hopeful it will still help with the digging.

Advertisements